MINING,
METALLURGICAL AND ENGINEERING PROJECTS
(Click on
links to read Project details)
|
CLIENT |
PROJECT |
LOCATION |
METAL |
TASK |
|
American Pyramid
Resources |
Fallon |
Nevada |
Ag |
Designed Tailings
Water Reclaim System |
|
Anglo Canadian
Mining Corp. |
Masonic Gold Project |
California |
Au |
Technical Report
&
Prefeasibility
Study |
|
Asamera Oil Co. |
Gooseberry Mine |
Nevada |
Au-Ag |
Operations Audit,
Ore Reserves, Metallurgical
Balance
|
|
Asamera Oil Co. |
Gooseberry Mine |
Nevada |
Au-Ag |
Prepared Refinery
Design and Capital & Operating Cost Estimate |
|
Borealis Partners |
Borealis Mine |
Nevada |
Au |
Lease
Administration |
|
Coeur d’Alene
Mines Corp. |
Thunder Mountain |
Idaho |
Au |
Preliminary
Feasibility Study |
|
Cominco American |
Buckhorn Project |
Nevada |
Au-Ag |
Feasibility
Study, Engineering, Metallurgy |
|
COMSUR |
Potosi |
Bolivia |
Ag |
Procure & Ship
Merrill Crowe Circuit to Potosi |
|
Cyprus Mines Corp |
Northumberland |
Nevada |
Au-Ag |
Engineering,
Metallurgy, and Development |
|
Icarus
Exploration
Company |
Adelaide Crown Project |
Nevada |
Au |
Designed Leach
Pad, and Ponds |
|
Lacana Mining
Corp |
Relief Canyon |
Nevada |
Au |
Ore Reserves,
Mine Plan, Capital Cost Estimate & Construction
Schedule |
|
Lakeside Sand &
Gravel Company |
Issaquah Quarry |
Washington |
Sand & Gravel |
Resource
Determination, Plant Relocation & Construction
Budget |
|
Midwest Ore
Processing Co. |
Sulfur Prospect |
Nevada |
S |
Calculate
Indicated and Inferred Mineral Resources |
|
Minerex Resources
Limited |
Aurora Mining District |
Nevada |
Au |
Ore Reserves,
Geology, Feasibility, Expert Witness |
|
Nana Regional
Corp. |
Red Dog Project |
Alaska |
Zn-Pb-Ag |
Project Planning
and
Feasibility
Studies |
|
NERCO Minerals
Company |
Candelaria Mine |
Nevada |
Ag |
Ore Reserve and
Operating Cost Audit |
|
Northwest
Exploration Company |
Placer Operations |
Alaska |
Au |
Feasibility
Studies on 3 Placer Operations |
|
Ranch Arroyo Seco |
Ione |
California |
Clay &
Lignite |
Determine NPV of
Owners Interest. Assist with Lease Negotiations |
|
Ranchers
Exploration & Development Co. |
Escalante Mine |
Utah |
Ag |
Refinery Design |
|
Sierra Pacific
Power Company |
Carlin Trend Gold Mines |
Nevada |
Au |
Estimate
Electrical Power Requirements for Developing Barrick
& Newmont Mines |
|
Siskon Corp. |
Aurora |
Nevada |
Au |
Prepared Capital
and Operating Budget |
|
Sonora Gold |
Harvard Mine Jamestown |
California |
Au |
Gold Audit |
|
United Mining
Corp |
Virginia City |
Nevada |
Au-Ag |
Engineering and
Geological Services |
|
|
|
|
|
|
Red Dog Project
| Zinc-Lead-Silver
Assisted in selection of joint venture partners and in
preparation of the business plan for the Red Dog project
in Alaska. Assisted in conceptual arrangement of the
mine and plant and in the selection of road route.
Continued to advise NANA Regional Corporation at the Red
Dog management committee meetings until 1992. This mine
is now the world's largest zinc producer.
Back to Top
Harvard Mine Jamestown
| Gold
Semi annual audit of gold ore produced by Sonora Gold
from sulfide ores in the Harvard mine in Jamestown,
California. Semi-annual detailed review of mining and
milling operations in Jamestown, California: of truck
transport of concentrates to the cyanidation extraction
plant near Yerington, Nevada, and the cyanidation
extraction mill. Ore reserve review and check on
metallurgical performance of the flotation concentrator
and cyanidation plant. Starting in 1979, advised owner
in negotiating the development agreement for the
property and then provide an annual review of progress
until production commenced in 1987. This mine produced
100,000 ounces of gold per year when it was in
operation.
Back to Top
Borealis Mine
| Gold-Silver
Major services, including lease administration, were
provide for owners of the Borealis Mine Royalty
interest. Performed the conceptual geological analysis
which defined the area of influence within which most of
the ore has been found to date and assisted with the
negotiations which led to leasing of the property.
Houston International Minerals Corporation for
development. Provided regular reports to the owner and
conducted periodic review of the operation on behalf of
the owners. Production from this mine varied between
40,000 and 80,000 ounces per year until it was closed in
1990.
Back to Top
Northumberland
| Gold-Silver
Extensive services were provided to Cyprus Mines
Corporation/AMOCO Minerals on the Northumberland project
from inception until it was sold in 1985. Services
provided in these major categories:
Engineering: Ore reserve estimation and mine
planning was done on an annual basis from 1979 through
1985 when the mine was sold. Detailed drawings were
prepared for the process plant and site engineering.
Construction supervision was provided for the crusher
site, plant site and leach pads. Designed the 9.5 mile
haul road, wrote the construction bid documents and
supervised construction. This was a $20 million project
and was the third major heap leach operation built in
Nevada.
Metallurgy: Performed recovery studies to
determine recovery variability from different parts of
the deposit. Assisted with grade control in the mine and
quality control in the assay lab. Assisted with the
establishment of metallurgical balance procedures for
the recovery plant. Performed a special study on silver
recovery using sulfide precipitation as a recovery
method.
Development: Managed the continuing drilling
program for the mine, provided pit mapping services on
an annual basis, and ran the geological exploration
program. On the property.
Back to Top
Masonic Gold Project | Gold-Silver
Prepared a technical report and preliminary feasibility
study for the Anglo Canadian Mining Corporation on the
Masonic gold project in California. Services included: a
confirmation/step-out drilling program, preparation of a
geological and mineable reserve estimate; review of all
available metallurgical records and set up of a
conceptual flow sheet; preliminary capital and operating
costs estimates; developed schedule and construction
budget. Both heap leaching and conventional milling were
evaluated for this project.
Back to Top
Gooseberry Mine
| Silver- Gold
Performed an operations
audit, cost center analysis, metallurgical balance study
and prepared a cost reduction and expansion plan for
Gooseberry Mine on behalf of Asamera Oil Company. The
plan that was developed was implemented by Asamera.
Performed ore reserve audits for the mine in 1981, 1982
and 1983. The operating plan developed by WHITNEY &
WHITNEY, INC. served as the basis for a $15 million
financing agreement for the mine in 1983.
Back to Top
Buckhorn Project
| Silver-Gold
Prepared the final feasibility study of the Cominco
American Buckhorn project. Assembled previously
generated data in a final report, prepared capital and
operating cost estimates; a construction budget and
assisted in the preparation of economic analyses.
WHITNEY & WHITNEY, INC. presented its report and
estimates to the Cominco Ltd. Board of Directors and
senior staff. The project was authorized with a $12
million budget and was constructed within budget.
Engineering: Prepared the site layout plan, final
leach pad design, pregnant solution pond design, barren
solution pond design, water supply, fuel supply,
solution distribution system, assay lab, maintenance
shop, refinery and office building designs. Prepared the
study for geological and mineable reserves and mining
schedule of ore, low grade ore and waste. Completed
final engineering for waste storage, low grade storage
and haul road. Supervised construction of leach pads,
ponds and assay lab. Acted as purchasing and receiving
agent for the owner. Supervised construction of the
refinery.
Metallurgy: Supervised metallurgical testing
program that led to the successful development of the
agglomeration/heap leaching flow sheet for ore with more
than 90 percent clay content. Developed the flow sheet,
including definition of leach cycles, and recovery
curves to be used for economic planning.
Development: Defined and managed a program of
confirmation and condemnation drilling. Complied and
checked previous drill data.
Back to Top
Virginia City
| Silver-Gold
Performed various
engineering and geological services for United Mining
Corporation at Virginia City, Nevada. Services included
development of an operations start-up plan, making an
inventory of all available reserve materials and a mill
feed sequencing schedule. Developed and supervised a
"wild cat" drilling program designed to find near
surface, higher grade material to provide mill feed. One
area of high grade mineralization was identified. The
operations start-up plan was one of the documents used
by UMC to make the reverse take-over with Silver Strike
Resources of Vancouver and it was also used to obtain
NASDAQ listing for Silver Strike/UMC in the U.S.
Back to Top
Gooseberry Mine
| Silver-Gold
Prepared a refinery design and capital and operating
cost estimate for the Gooseberry Mine. Designed tailing
dam.
Back to Top
Adelaide Crown Project
| Gold
Designed the leach pad and pregnant, barren, and runoff
ponds for the Adelaide Crown project, Nevada, for Icarus
Exploration Company. This project has been successfully
brought into production.
Back to Top
Carlin Trend Gold Mines
| Gold
Estimated the electric-power requirements for large gold
mines being developed by American Barrick and Newmont.
Open pit and underground operations were considered
along with processing plants. Study was done for Sierra
Pacific Power Company.
Back to Top
Aurora Mining District
| Gold
On-site investigation covering geology, ore reserves,
and the technical and economic feasibility of a proposed
open-pit gold project in the Aurora mining district,
Nevada, for Minerex Resources Ltd. Assisted with
negotiations with adjoining land owner to expand the
operations. Provided expert witness services on behalf
of the operator in contract dispute.
Back to Top
Placer Operations
| Gold
Prepared complete feasibility studies for Northwest
Exploration Company on three placer mining operations in
Alaska. Each operation was in a different environment
requiring different mining plans and methods. Prepared
capital and operating cost estimates for each mine, then
completed economic analyses for each project and the
three projects combined. Northwest Exploration Company
was the second largest gold producer in Alaska in 1984
and has since successfully expanded its operations.
Back to Top
Relief Canyon
| Gold
Prepared the ore reserve study, mine plan and
preliminary operating and capital cost estimate of
Lacana Mining Corporation's Relief Canyon project. The
WHITNEY & WHITNEY, INC. capital cost estimate and
construction schedule were used for project control
during construction which was completed in 1984. The
project was completed within the estimated budget.
Back to Top
Aurora
| Gold
Prepared a capital and operating cost estimate for
Siskon Corporation on a proposed gold mining/milling
operation near Aurora, Nevada. this property was
subsequently put into production by Nevada Goldfields
Corporation.
Back to Top
Thunder Mountain
| Gold
Prepared the preliminary
feasibility report of the Thunder Mountain project for
Coeur d'Alene Mines Corporation. This report was used
for a $20 million stock offering which was successfully
completed that year. Performed feasibility study audit
for CDA Mines Corporation on the same project in
April-May of 1984. This property was successfully put
into production.
Back to Top
Potosi
| Silver
Assisted in purchase, disassembling, packing and
shipping of Merrill Crowe Circuit refining equipment and
certain industrial equipment from United Mining
Corporation's mill in Virginia City, Nevada to Potosi,
Bolivia, for installation at COMSUR's silver heap
leaching operation at Potosi. WHITNEY & WHITNEY, INC.
performed all necessary functions including submittal of
engineering drawings and equipment procurement. the
equipment was successfully installed by the operator and
has been operating since mid-year 1988.
Back to Top
Candelaria Mine
| Silver
Performed an ore reserve and operating cost audit of the
Candelaria mine for NERCO Minerals Company prior to
their acquisition of the project.
Back to Top
Escalante Mine
| Silver
Prepared the refinery design for the
Escalante mine for Ranchers Exploration and Development
Company. This refinery was constructed and proved to be
one of the lowest cost mine refineries in the U.S.
Back to Top
Fallon
| Silver
Designed tailings water reclaim system for silver mine
being constructed by American Pyramid resources of
Fallon, Nevada. Prepared an ore reserve audit and
capital and operating cost audit for project's bankers.
Back to Top
Issaquah Quarry
| Sand and Gravel
Completed the drilling program and geological mapping at
the Issaquah, Washington, sand and gravel property of
Lakeside Sand and Gravel Company. Prepared technical
analysis to justify relocating crushing and screening
plant. Prepared detailed capital and operating cost
estimates for reorganized plant, engineering drawings
and relocation and construction budget. The project was
completed by the client under budget and within
schedule.
Back to Top
Ione |
Industrial Minerals
Mineral valuation of Ranch Arroyo Seco, Ione,
California. Determined the net present value of the
owner's interest in mineral commodities being produced
from the ranch. In prior years, assisted with lease
negotiations for production of clay materials and
lignite.
Back to Top
Sulfur Prospect
| Sulfur
Estimated measured, indicated and inferred mineral
resources of a sulfur prospect located in Humboldt
County, Nevada, for Midwest Ore Processing Company.
Recommended procedures for the discovery and development
of additional resources and reserves.
Back to Top
|